What to Do When Your Newt Won’t Eat

[ad_1]

Your newt may look small and cute but make no mistake he or she is a hunter. Newts are carnivorous hunters, that in the wild, hunter for fresh food every day in order to sustain their life. Newts are also much smarter than some of the other fresh water aquarium pets you may have. Pets like gold fish don’t know the difference between flaked fish food and live fresh food. Fish will never turn away a meal just because it isn’t wiggling at the surface of the tank. This isn’t necessarily true with newts.

Many times certain newts, especially fire bellied newts, will refuse food the isn’t fresh. This is due to their hunters instincts. These instincts have kept newts alive for millions of years and can not be easily over looked. So what do you do if your pet newt isn’t eating the food you are feeding it?

This is not a very big problem, if your newt isn’t eating the dry food you are attempting to feed it, you should probably try fresh food. Fresh, live food will very likely stimulate your newts hunter’s instinct and they will catch and feed it.

Here are some examples of some store bought food a finicky newt may eat. Try feeding your newt brine shrimp, blood worms, tubifex, daphnia, or mosquito larvae. These types of pet food can be found in most larger pet stores. Here are some examples of newt food you can find right in your back yard. Try to catch small bugs, crickets, slugs or earthworms. These are critters that most of us can find right in our back yards.

So if your newt isn’t eating the newt s flakes or pellets, don’t panic try some fresh food instead.

[ad_2]

Source by Dean Anderson

Round Bottle Cooling Tower – For All Those Cutting Edge Cooling Requirements

[ad_1]

As a matter of fact, cooling towers are most often considered as important requisites in the setting up of industries manufacturing petroleum refinery, petrochemicals, nuclear power plants; electricity generating, chemical processing, air conditioning and natural gas processing. These towers provide higher levels of cooling crucial for the smooth functioning of all industrial applications.

Industrial cooling towers in a broader sense are essential heat removal devices that release process waste heat into the atmosphere via an internal circulating system that is installed within the tower. This system absorbs all the heat from within and in the process emits highest levels of cooling. The heat required to evaporate is derived from the water itself which causes it to cool down in a process known as evaporative cooling system. A great solution provider to all industrial applications, these towers has surely come a long way, facilitating the cutting short of time and energy upon installation. They are a one time investment and are extremely durable as they are manufactured using heat resistant materials that can sustain high temperatures.

These towers are available in various sizes according to the industrial requirements; with a standard size that is 200 meters long and 100 meters wide. Cost effective and energy saving devices, these towers are available in the form of rectangular, round bottle, cross flow and fan and fills less cooling towers. Popular of them all is the round bottle cooling tower, which is manufactured using fiberglass reinforced plastic which is highly corrosion resistant and gives sufficient structural strength to the tower to be able to withstand high wind velocity and vibration. These towers contain enough storage space intended for a greater storage of water for a trouble free and non stop operation. The tower is constructed using devices that ensure non stop functioning basically comprised of a fan, fan motor, water distribution system, fills and a steel structure. The corrosion resistant axial flow type, light weight fan installed at the topmost part of the tower, ensures high energy savings generating maximum air flow at minimum pitch angle of blades. The low weight PVC fills in its place functions best at generating high performance and resistance against corrosion. These fills strike a perfect balance between heat transfers in comparison to the minimum restriction of air flow. What’s more, the steel structure of fan supports, motor stands and other bolts are made of superior quality steel that can withstand any internal activity.

The round bottle cooling towers have been much appreciated by industry users on account of their benefits of being sustainable, cost effective and long lasting. This tower is available with many companies these days in any size specifications at unbelievable rates.

[ad_2]

Source by John Tweak

The Choice of the Freezer

[ad_1]

The Chest Freezer

One of the most popular home freezers appears to be the chest type which is available in several sizes. The 6 cu feet freezer holds approximately 200 pound of frozen foods if stacked correctly. The 10 cu feet size will hold approximately 350 pound. Both these sizes will suit the smaller family. They keep everything fresh no matter how high the temperature outside, and give easy access to food. However, the larger family or farmer’s wife would probably need the 16 cu feet freezer which holds 550 pound or the 22 cu feet size holding around 800 pound. Foodstuff may be kept frozen all year round in the large chest freezer which makes them economical for country properties.

The chest type freezer usually has a magnetic seal around the complete lid, which prevents warm air getting into your freezer. The quick freeze area is situated over the electric motor end, however good quality freezers have the freezing pipes all around the walls and at the bottom, not just at one end. Vinyl coated dividers are provided with the larger chest freezers. The dividers enable you to keep different types of food separate. Vinyl coated baskets are also supplied with the chest type freezers. These are ideal for an assortment of small items.

Most well made chest type freezers have a temperature control situated on the outside, which enables you to switch to quick freeze when putting a large quantity of food in at the one time. Any type of food which is frozen quickly is of far better quality when eaten later.

The Upright Freezer

If kitchen space is a problem I would strongly recommend the upright or vertical freezer as it is a great space saver, taking up very little valuable floor space. Once again, there are several sizes to choose from. The top quality upright freezer usually has vinyl coated adjustable shelves and steel interior lining, with freezing pipes situated all round, lining sides, back, bottom and top i.e. inside the lining, out of sight.

The quick freeze area is situated at the bottom directly over the freezer motor. A temperature control and quick freeze switch is also usually positioned at the bottom. With a touch of the toe you can switch to quick freeze. Once food is frozen switch back to thermostatic control. Remember the quicker you freeze food the better the quality. There is usually plenty of door space for easy access to smaller items. An ice bucket and several ice cube trays are also usually supplied. Once again, a magnetic door seal gives a perfect seal every time.No chance of warm air getting in which means no waste of precious power. Of course, the convenience of the upright freezer should not be forgotten for when the shelves are full of frozen food, it gives you a supermarket in your own kitchen!

The Refrigerator Freezer

If you need a new refrigerator and have never owned a deep freeze, I would suggest you trade in your old refrigerator for a new two door dual temperature refrigerator freezer. This is two appliances in one, a household refrigerator plus a true long term deep freeze cabinet. You will never regret the extra cost because you will have the pleasure of automatic frost-free in both compartments. Frigid fresh air is injected by a fan into the refrigerator and freezer and circulates continuously so there is no frost or consideration. Defrosting is unnecessary and you can identify your frozen food immediately because it does not ice up. You can buy frozen food specials at the supermarket, store them in your freezer and save several dollars a month on you grocery bill. You will also find your first deep freeze a great convenience as left over foods can be packaged, frozen and used weeks or months later.

The deep freeze storage cabinet of the refrigerator freezer is usually positioned on top of the refrigerator cabinet. In some models they are side by side, and a few have been manufactured with the freezer under the refrigerator compartment. All models are usually fitted with an interior light and vinyl coated adjustable shelves. In the refrigerator compartment there is an egg rack, a dairy chest for butter and cheese and a crisper for vegetables. Once again, magnetic door seals are fitted to all quality refrigerator freezers to keep cold air in and warm air out. The dual refrigerator freezer takes up very little precious kitchen floor space. You will never regret buying a good quality deep freeze.

[ad_2]

Source by Yao Daphnie

What the Food Is Like On A Navy Ship

[ad_1]

I was in the navy for 8 years, and I’ve had food from navy destroyers, aircraft carriers, submarine tenders, and shore duty galleys.

When a ship is in port, it always had plenty of fresh food on board. Right before a ship pulls out to sea, it is replenished with new food and drink.

If you going to be out to sea for a while, you will start to lose some of the things on board you take for granted. Fresh milk is usually one of the first things to go. They substitute it with powdered milk, and it does not even come close to real milk.

Don’t get me wrong, the food on the ship is actually pretty good, and you get plenty of it!

When you are in port, you have access to the freshest foods the navy has, just like your hometown grocery store pretty much.

When you wake up in the morning, you go down to the galley, and get in the chow line. There might be 10 guys in line by the time you get down to eat, and breakfast is usually served most of the morning, because not everyone can eat at the same time, and it would be over crowded then. On smaller ships, like destroyers and frigates, you usually would have 4 meals a day. Breakfast, Lunch, Dinner and Mid Rats, a small meal that make around midnight for people that are still hungry, and want something to eat.

On the destroyer I was stationed on, we would also regularly have cook outs right on the fantail. We always had a 55 gallon drum that was cut in half, and someone from the Supply Department would be frying cheeseburgers, and that was always nice, even out in the middle of the Indian Ocean, we would be having a cook out.

For breakfast, you can usually order your eggs to order, there will be a cook or 2, that take requests for how you want your eggs made, they had a rule not over 5 eggs, I usually only had 2 most of the time, and I would tell them I want a ham & cheese omelet with 2 eggs, and then after I get my eggs, I move down the chow line, and get whatever else I want to go with that, bacon, sausage, just like a small buffet really.

Usually on Fridays, if we were in port, we would have steak and lobster tails on Fridays. I never even really had a lobster tail until I joined the navy. My dad never liked sea food when I was a kid, so we never had it in our house.

Lunch and dinner were usually like a buffet also, just about anything they had, was a line of good food, and you take what you want, and you can always get a new tray and go back in line again, if you are that hungry.

The aircraft carrier I was on, was actually way too big of a ship for me, and I was so glad I only had to stay on it for 2 weeks. There food was good also, and it had 2 galleys, so that one was always open, if the other closed for cleaning or whatever reason.

When you have roughly 5,000 people on board, you better have a place for them to eat all the time, just like a casino, if the ship had slot machines on it, it would be pretty close to the same atmosphere of a buffet.

When I was in transit somewhere out in the Indian Ocean, I had to go to Saudi Arabia to get on a flight to Italy, and a helicopter flew me and about 5 other enlisted guys out to this USNS ship, and we were supposed to just ride the ship for 2 days, until we got off the ship. They had an enlisted 1st class yeoman that had his own stateroom, which on a regular navy ship, just the officers get.

This was a USNS ship, which meant it had civilian workers, and the navy personnel was support for them. When we ate in their dinning room each day, a waiter would come to our table, and he would take your order. I thought to myself, you have to be kidding me, these guys are wearing civilian clothes, and a waiter is taking their order, and I can’t even believe this is real. They give you a choice of 2 selections, sort of like on an airplane, and they bring you ice cream as dessert, and I thought that was unreal.

Most of the civilians on that boat were not cool like the navy guys, probably because they thought the navy worked for them, which on that ship, they sure did, and I could think of several ways to save the navy a boat load of money!

Submarines get some of the best food in the fleet. They guys are under water sometimes for so long, and could you imagine if they did not have good food?

They have a drink they call bug juice, which is really Kool-aid or a fruit punch drink. You better get used to drinking bug juice, if you like something to drink with your meal, after the fresh milk runs out.

Here is one of the craziest things I’ve witnessed on the ship, and every ship does it! It is such a waste of good food, but I guess you can see how it does protect the states from pests and bugs, but does it really?

When ever you are going out to sea far, you usually stop by Hawaii to get new stores, as they call it, which means you are stocking up the ship with fresh food and meat and stuff like that.

As you travel the world, and then are returning, before you stop by Hawaii, you have to throw all the food that could have any chance of having any type of bug from another country in it, so we have a working party, of maybe 20 guys, and the job is to make a line from the food refrigerators, which a ship has several decks of them, all with elevators to make it all together, and we unload all the food, 50 pound bags of brand new onions, lots and lots of them, big boxes of lettuce, lots of boxes of it.

We throw just about everything this is left in the coolers overboard into the ocean, and all the guys just can’t believe we are throwing all this good food overboard, and we bet a lot of sharks are following the ship, and can you imagine how much food an aircraft carrier would throw over board. An aircraft carrier has a place on the back of the ship for throwing trash into the ocean, but only when you are out 50 miles or more to sea, so it does not wash up on the shore, and so many things are thrown in the ocean, besides food. You can sit and smoke a cigarette, and just watch all the people that have trash to throw in the ocean, pretty bizarre in a way, but you can’t have it pile up on the ship.

I would have to say overall, the food in the navy is good, maybe even great, I would of never thought it would be as nice and plentiful as it was, and some days after being out of the navy, I swear their spaghetti is still the best I ever had in my life!

[ad_2]

Source by Vince Stead

Freezer Cooking – A Great Way to Save Money on Your Monthly Grocery Bill

[ad_1]

Some people call this once-a-month cooking, once-a-week cooking, or freezer cooking.  The names may be different but the concept is the same.  You block out one day and do the bulk of your cooking for the designated time period.  

This can really be a great money saver for those families who don’t feel like they have enough time to cook on weeknights and consequently eat out frequently. This is also great because you can build your weekly cooking around the sales, buying in bulk, or those items you are able to use coupons to buy for pennies. 

If this is the first time you’ve ever done this, I suggest planning on cooking for one week.  Carve out a day where you know you can cook with minimal interruptions. 

Make a list of what you are going to cook for the week.  Try to build some meals that are different but have similar ingredients – perhaps a chicken stir fry that includes onions and bell peppers for one meal and chicken fajitas that also include onions and bell peppers for another meal.  They will taste different enough that it doesn’t seem like you are eating the same things over and over, yet they are built around the same ingredients.  This saves you preparation time and money. 

Purchase or assemble the ingredients you will need for your cooking marathon.  To organize yourself, first look at all of your recipes that you will be making for the week.  A prep list is a great tool when you are cooking this way. Sit down with your recipes and write down everything that needs to be done for your cooking marathon. If one recipe calls for you to chop garlic, write the amount of garlic down that you need. Then if a second recipe also calls for chopped garlic, add the amount to the previous “chop garlic.” This will keep you organized and working on things in the fastest way possible. Or let’s say you are going to have tacos and spaghetti this week.  You will need ground beef for both of these.  Instead of browning beef once for tacos and then a second time later that day for spaghetti, you’ll want to do it all at once in one big batch.  The same is true for cutting up vegetables.  If three of your recipes call for chopped onion, cut the onion you need for all three recipes rather than cutting it three times. 

Once the items are cooked, you want to let them cool and then either freeze the whole dish or cut them into individual servings and freeze those.  The nice thing about the individual servings is you can use these for dinners for one or to take your lunch with you. This can be a tremendous money-saver.  Instead of eating out or buying convenience items in the store you have a healthy and home-cooked frozen entree to reheat at work.

Make sure you wrap things very well that are going in the freezer. First wrap the dish with plastic wrap and then cover that with foil. If you are freezing something in a plastic bag, try to get as much of the air out of the bag as possible. Also, label everything with the name of the dish and the reheating instructions. 

To streamline this process for the future, keep the recipes and the prep list all together in a binder. Once you get four or five of these weeks worth of meals built up in your binder, you can start cycling through them. This will save you even more time. You won’t have to gather recipes and make a prep list each time you do this. Just pull out a week’s worth out of your binder and make those for the week.

With a little bit of ingenuity and planning, you can make home cooking a huge time and money saver for your family!

[ad_2]

Source by Lindsay Landis

How to Start and Maintain a Weight Training Program

[ad_1]

You should begin your weight training program with both short and long-term goals. Identifying goals is an important means of maintaining interest and enthusiasm for weight training. A key point is to establish realistic short-term goals that can be reached in the first several weeks of training. Reaching these goals provides the motivation needed to continue training.

Developing an Individualized Exercise Prescription

The exercise prescription for strength training has three stages: the starter phase, the slow progression phase, and the maintenance phase.

Starter Phase

The primary objective of the starter phase is to build strength gradually without developing undue muscular soreness or injury. This can be accomplished by starting your weight training program slowly beginning with light weights, a high number of repetitions, and only 2 sets per exercise. The recommended frequency of training during this phase is twice per week. The duration of this phase varies from 1 to 3 weeks, depending on your initial strength fitness level. A sedentary person might spend 3 weeks in the starter phase, whereas a relatively well-trained person may only spend 1 to 2 weeks.

Slow Progression Phase

This phase may last 4 to 20 weeks depending on your initial strength level and your long-term strength goal. The transit ion from the starter phase to the slow progression phase involves three changes in the exercise prescription: increasing the frequency of training from 2 to 3 days per week; an increase in the amount of weight lifted and a decrease in the number of repetitions; and an increase in the number of sets performed from 2 to 3 sets.

The objective of the slow progression phase is to gradually increase muscular strength until you reach your desired level. After reaching your strength goal, your long-term objective becomes to maintain this level of strength by entering the maintenance phase of the strength training exercise prescription.

Maintenance Phase

After reaching your strength goals, the problem now becomes, how do I maintain this strength level? The bad news is that maintaining strength will require a lifelong weight training effort. Strength is lost if you do not continue to exercise. The good news is that the effort required to maintain muscular strength is less than the initial effort needed to gain strength. Research has shown that as little as one workout per week is required to maintain strength.

[ad_2]

Source by Pinvalee Prapa

Lowes Garage Door Installation Cost Will Save You Money

[ad_1]

Lowes Home Improvement stores are well known for their low prices and quality products. If you own a home you probably have used Lowes to find the products you need to improve, maintain or repair it.

Searching for and finding the right garage doors for your home can be a nightmare even if you use the Internet to conduct your research. The best garage doors available are frequently the most expensive however you should not use garage doors pricing alone to make your selection.

Your selection process should carefully consider installation costs, construction materials, removal of any existing door, type of garage door opener and warranty. Lowes garage doors installation costs are considered one of the best buys on the market today. Lowes installers are considered and called partners and they must meet Lowes strict standards. Every installation is rated by the purchaser to assure that customers are receiving the quality services they are paying for.

Lowes garage doors installation costs range from as low as $199 to $599 depending on the size of the door and where the door is being installed. Obviously installing an oversize garage door will require more skill and time. If you need to install a garage door opener as part of your installation you can expect additional cost. Over all the, Lowes garage door installation cost is slightly lower than the average installation costs.

As an alternative to purchasing your garage door from Lowes you should consider comparing prices and services with Home Depot. Both Home Depot and Lowes sell quality garage doors. Just as with Lowes Home Depot provides garage door installation services that are comparable. In addition you have the option of installing a garage door yourself. Both home improvement stores will assist you in your efforts. The downside of self installation is the time it takes to complete the installation and the cost of disposing the old door which normally part of any professional installation cost. Self installation will also require you to have the assistance of at least one helper.

We feel that the Lowes garage door installation cost is very reasonable and provides the home owner the peace of mind knowing that the installation was done correctly. Occasionally installation cost can be included in the purchase price of your garage door. Be sure to check with you Lowes sales representative on the latest sales offers.

[ad_2]

Source by Jim Kesel

Data Center & Server Relocation Planning and Execution

[ad_1]

Until recently, most companies considered data center relocation to be a once in a lifetime event. As infrastructure demands and technology advances continue to expand, current forecasts predict 3-5 moves, with 53% percent of companies expecting to do so within the next few years. What is your company blueprint for a successful data center and server relocation planning and execution?

Data center movers and server movers have experience in the complexities required for a successful relocation. Working hand in hand with your IT team ensures a minimum of down-time, as well as maximizing performance before, during, and after the move. Selecting a partner with the knowledge of the intricacies encountered during a move can make the difference between a smooth transition and a potential nightmare.

Comprehensive Planning

Proper planning is crucial for companies that are planning to relocate their data centers and servers. Team coordination, both within the company, as well as with the data center movers and server movers who have been chosen to perform the move, is essential for a successful data center relocation, as illustrated by mistakes that plagued the State of Oregon relocation.

Hoping to upgrade and move their data bases into a single facility, the state spent $20 million building a new site, and finished the move of 11 of the projected 12 agencies into their new facility, at a cost of $43 million. Unfortunately, the 55-watt per square foot did not meet the requirements of the Department of the Department of Consumer and Business Services, forcing them to return to the original site. Data security concerns kept the Department of Education from ever moving into the new facility. Other issues were also noted, including the lack of a solid disaster-recovery plan.

Protecting your company from similar issues and meeting the strategic objectives that precipitated the move will make the difference between a smooth successful transition, and one that is not. Proper planning is essential, and is greatly impacted by the team you choose for your data center relocation.

Wiring, space, and cooling capacity are just a few of the issues that must be addressed when addressing hardware issues pertaining to a data center relocation. Although this may seem to be the ideal time to implement upgrades, many experts recommend implementing them slowly, especially when they pertain to software.

Strategic long-term planning should be the first step. Moore’s Law, which he stated in 1965, predicted essentially that computer technology would double every two years. This rule has basically held true, however it is currently projected to double approximately every 12-18 months. This translates into the need to forecast possible upgrades sooner than in the past. Since your company is expecting to move, this is a great time to address the issue, and create a long-range plan.

Data Center and Server Relocation planning and execution relies heavily on the skills of professional server movers and data movers working alongside the IT team to perform a seamless transition with a minimum of downtime.

The Key to Success

The key element to a successful data center relocation project is choosing the correct team coordinator. Most companies do not have someone with this experience on staff, as it is a specialized industry, with unique challenges. Selecting an internal coordinator to work with the data center movers and server movers is also key to a successful relocation project.

The external coordinator you choose must be able to provide an adaptive plan, based on your company’s individual needs and resources. Their role will include creating a timeline and milestones for the move, pre-planning, and identifying risks and impact of the move. Additionally, they will create an execution plan that includes shut-down times, wiring requirements for the new location, cooling requirements, as well as many other often-overlooked crucial items.

Data Center Relocation Planning Documentation

The required documentation should provide a detailed overview of the plan. Items that should be listed include:

  • A comprehensively organized and detailed list, including diagrams of everything currently in use. Hardware, software, wiring, inventory lists, application dependencies, support processes, and interactions should all be thoroughly documented. This provides an opportunity to determine what should be retained and what should be replaced. Although this appears to be the best time to physically replace outdated technology, there are a few reasons not to do so. More on that later.
  • Envision your ideal working environment. Anticipate which processes will make the relocation successful. Documentation at this stage will include details of the move, whether servers will require updates, changes in virtualization, and upgrades.
  • A relocation blueprint should be developed at stage three that will detail the process of advancing from where your company currently stands to where you want to be in the future. Budgeting, prerequisites, detailed shut-down and restart timelines, identification of known risks, creation of a contingency plan, and a statement of impact for the client are a few of the items that should be included in the blueprint.
  • The coordinator should include a detailed implementation plan. At this point, each department will have been interviewed in order to identify and rate the processes used, and their order of importance. It is essential to conduct the relocation with a minimum of negative impact, including down-time. An hourly schedule that outlines what will be shut down and moved during relocation will alleviate inconvenience and concerns that employees may have regarding the move.
  • It may seem obvious, but hiring a team that has a crew of sufficient size to actually physically perform the move is imperative for success. Logistics specialists who have the experience required to to identify, pack, relocate, unpack, and setup the system is a crucial. This team must include skilled technicians who are able to properly reinstall the system.
  • Don’t underestimate the complexity of the move. Your company will most likely need to provide internal specialists to a certain degree, as they know your software and environment. The amount of help you hire can vary depending on individual needs. Discuss this with the vendor when choosing server movers and data center movers.
  • Put together a strong in-house group of trusted staff to work with the professionals. This team should include not only IT, but also management. It is important for everyone to be on board and to fully understand all the aspects and potential impact of the move.

While the above plan may make a data center relocation seem relatively simple and to the point, there are pitfalls that can plague even the best plan. Pinpointing potential problems before they occur can help reduce the problems your team will encounter. While each relocation and situation is individually tailored, it is a good idea to identify pitfalls.

Problems Data Center Movers and Server Movers Want You to Avoid

  1. Although this problem is easily avoided, Poor Planning tops the list. One of the most important functions the team can perform is communication. By talking to the IT department, the relocation team can learn about the inter-dependencies that occur within the company network. This will alleviate accidental shutdowns on moving day, and get everything up and running again in the correct order. Double-checking the hardware lists, and correctly estimating server requirements and hardware is equally important to a successful move.
  2. As shown in the State of Oregon fiasco, wiring and electrical demands are crucial. Obtain a realistic figure of the amount of electricity currently consumed, as well as what the upgrades require. IT may not be the department with these figures. Costs often exceed what is projected in this area. It is essential to have real figures. This is also a time to scrutinize whether the relocation property will be purchased or leased, and who is responsible for future wiring upgrades if they are required.
  3. Identify your current baseline costs and operation prior to the move. In this way, you will have a point of comparison for the future. This can negate many internal problems after a move.
  4. Many specialists believe they encountered fewer problems by upgrading after the move. If everything is in place for a planned upgrade, but the system is delayed until after the relocation, users are able to retain continuity in their work. There are exceptions to this however, including networking gear, and re-IP, as they do not have a great impact on the software and easier to perform during the move.
  5. Choose and experienced professional for the move. Each department is specialized, and while you may assume IT fully understand the system, they may not have all the knowledge required to successful move and reinstall it.

By avoiding these common pitfalls, you are more likely to create a smooth transition. Planning for future expansion should be considered prior to the move.

Cooling Processors

With today’s high speed processors, proper cooling is essential. Whether you are building a new facility or leasing space, project managers need to assess the cooling capacity and compare them to what is required for your equipment. Identify a member of the team to thoroughly research and be responsible for this portion of the move. Cooling costs can be a notable portion of the day-to-day operation expenses, but without adequate cooling, the entire operation can be at risk.

The Nuts and Bolts Required of Server Movers

While there is an irony to physically moving a virtual machine, it is very important too do so correctly. Professional server movers know the importance of the machinery, and that it must be transported with care. Yes, there are people/movers who throw it on a flatbed, break rack legs, or just set it in the building and walk away; so we must be mindful of this.

Once your company has reached this point, in-house IT and the server movers your company has hired are probably on a first name basis. Specify someone from each team to address the following points, to alleviate problems with the move.

  • Cables that lead to nowhere are often left on servers over the years. Well prior to the move, ask IT to identify and remove any unnecessary cables. This will simplify and speed up the process on moving day.
  • Check with the team in charge of efficiency prior to moving, to ensure that all cooling, power, and space issues are aligned with any planned changes.
  • Check dependencies using the configuration design software that was used to setup the system, prior to removing anything.
  • Label, chart, and diagram everything. Each piece of equipment and every cable must be reinserted into the correct slot in order to work after the move. Keep the diagram and list in a safe place.
  • Mirror power requirements when changing cabinets.
  • List the exact location piece of equipment within the cabinet.
  • Mounting rails should be labeled. Hardware can thus be labeled with corresponding rails to ensure exact placement after the move.
  • Use a certified infrastructure handling solution specifically designed for data centers to remove equipment from racks.
  • Only move empty racks and cupboards. This prevents damage to the rack as well as to invaluable server equipment.
  • Clean and repair everything prior to reloading the racks.

Take the time to do it right. Moving full racks and cabinets can be a disaster, leading to excess downtime, and the extra cost cost required to replace damaged equipment. At this stage of the game you can see the light at the end of the tunnel, but don’t take shortcuts. This is the event that everyone has been waiting for and you want it to be a success.

The final step for server movers is recommissioning and testing the equipment to ensure it is all operating as smoothly as it was prior to relocation.

Expectation Checklist for Data Center Movers

Although they are technically two different projects, coordinating your data center movers and server movers will help ensure a smooth data center relocation project. Just as with changing software systems, this is not the time to cleanse the data base. We suggest doing so either well before relocation, or after everything is reinstalled, up and running well. The following checklist provides a short overview of issues and expectations that should be addressed by the team.

  1. While the physical relocation of hardware often seems to be the primary focus in a relocation project, the database is the crux of most companies. It is crucial to not overlook the data, and to plan for its move. Whether your company assigns ownership of databases to individual teams, or considers it as a whole, it remains an interconnected system. Application interaction after relocation is a consideration point, as well as identifying what data access may be affected by the move.
  2. While data center and server relocation can go hand-in-hand, this is a major project that will ideally be tackled on its own. Tacking on additional changes, i.e., tiered storage, etc., can add significantly to the cost and increase downtime.
  3. Brainstorm with colleagues, IT, and the data center movers to create contingency plan and worst case scenarios. With proper planning, they should not be a problem, but identifying them and addressing concerns in advance, can make the difference between a successful relocation and a disaster.
  4. Inventory, document, and diagram everything possible. The loss of records, even if they are short-term can have a devastating impact on a company. Negative ramifications resulting from lost databases can wreak havoc on orders, potentially leading to customer loss, and a negative impact on your financial base.

Tips for Successful Data Center and Server Relocation Planning and Execution

There will be down time during the execution of the data center and server relocation. As illustrated above, a well laid out plan is invaluable for a successful transition. The process can seem overwhelming, but with proper planning, it can also run smoothly.

We have identified a few tips that can be beneficial when planning to relocate your server and/or data center.

  • Begin with a standard plan. While all moves must be customized, based on the needs of your company, there are standard best practices that will make relocation easier. Professional data center movers and server movers know these plans and are able to adapt them to your unique circumstances.
  • Contact clients a few weeks prior to relocation with a projected downtime so they are not frustrated when attempting to contact you during the relocation.
  • Plan your move well in advance. Depending on the size of your operation and what is being relocated, the entire project may take a minimum of several months.
  • Don’t overload your current staff. IT may well have their hands full maintaining the current system, and they are often required to be on call to consult with the movers as well. Take time to discuss the importance of their role and to arrange a convenient time for them to work with the movers.
  • Plan around application managers. Development and applications will come to a standstill during the back end move, and they will require adequate advance notice and a timeline.
  • Address issues your company may have experienced during a previous move. Discuss concerns and create a contingency plan if there are fears that the experience may be repeated.
  • Set current baselines as a point of comparison for after the relocation.
  • Plan down to the hour, if not in smaller increments.
  • Discuss who will be responsible for anything that must be replaced and if the movers have parts on hand. These items can be as minor as screws or cables.

Execution of the Plan

Once moving day has arrived, it is time to begin the process of tearing down, transporting, and setting everything back up. Experienced data center movers and server movers will employ a proven methodology to do perform relocation in a timely manner. You should be able to expect:

  1. Technicians who are experienced in every aspect and detail of the move. They should have copies of the timelines and diagrams.
  2. Packing materials and trucks designed to transport without damaging hardware.
  3. Communication as required throughout the move.
  4. The project manager should be on hand to oversee the entire project as well as addressing any concerns.

Designate someone to sign-off once the move has been successfully achieved.

Communication is crucial to data center and server relocation planning and execution. Choose movers who have experience and who you can trust. They will become an integral part of your team before and during the move.

[ad_2]

Source by Shawn Simon

Advantages of Lift Tables

[ad_1]

With the help of good quality lift tables, it is possible to meet the needs of a variety of warehouse applications. Having a good quality loading dock equipment to undertake your work, can help smoothen operations and provide much relief to the personnel assigned with the job of lifting goods. This can save much time and effort.

Variety Of Uses Of Loading Dock Equipment

Advanced methods of lifts manufacturing has ensured the production of lift tables, a mechanism which helps lift materials and equipment to precise heights repeatedly, providing immense support to the workforce.

Keeping in mind different areas of work in a warehouse and loading dock, hydraulic lifts can play a huge role in the loading and unloading of equipments. Dock levelers, dock seals, shelters and vehicle restraints can also help simplify the shipping functions.

How Lift Tables Manufacturing Can Help

Lift tables work under the mechanism where pressure generated in hydraulic fuels is converted into motion. This helps these hydraulic lifts to undertake a huge amount of work and carry innumerable loads that too under any condition. This makes these tables sturdy and long lasting too.

Safety First

Safety is the most important factor. Injuries while lifting can prove to be fatal. They are designed to meet every standard of safety. The built-in security features can work in working condition. This eliminates the use of unsafe loading tactics. With such a variety of features, the loading dock equipment can offer immeasurable support to the personnel handling these machines.

Pentalift is in the business of providing positioning solutions, lift tables and loading dock equipment to handle any amount of work during shipping and other related activities. Its commitment to safety features makes it a better choice than others. Go for it and you would not regret.

[ad_2]

Source by Ann Fletcher

Advantages of Robotic Machining

[ad_1]

You can expect a high level of expertise if robotic technology has been introduced in the structural application of metal fabrication and welding. Robotic machining has attained a high value preference in the field of industrial mechanics since it integrates automated robotics for achieving quality manufacture and servicing. Power driven robotic tools can address mechanical impediments making them a constructive asset to have. If you’re searching for robotic project design and execution in your city then you can obtain a variety of precision equipment from the best machining facilities.

The use of robotic technology in the field of material removal applications like drilling, deburring, milling and chamfering has exceeded clientele expectations. For the production of machined prototypes that are utilized in aerospace, cryogenic, automation and medical technology, there are plenty of worldwide establishments that have topped the list. This business comprises of support services, material fabrication and high-powered robotic machinery. The production yield of appliances incorporated with robotic precision machinery is higher than manually empowered apparatuses.

Need for Robotic Machining

Machining applications suffer from individual threats however these complications can now be resolved using robotic technology. Industrial robotic technology is rigid, durable and incredibly strong. Consisting of automated engineering, the appliances are ideal for shaping or drilling into hard surfaces like metals. High speed performance and precision are particular characteristics of robotic machining based products. Developed to improve aesthetic and mechanical framework, robotic machines having multifaceted geometrics that function on computer based technology. This means that robotic machining requires a refined software and efficient EOAT resolution.

Benefits of Robotic Machining

With the constant pressure of high productivity and rising competition in the market, robotic precision machining has developed into a valuable alternative. It can readily replace machinery that functions on high power, electricity and physical components. Most robotic machining companies consists of facilities that offer efficient and quality products. The idea of introducing robotic precision machining is to improve the production line by automating the fabrication of materials through robots.

1. Instead of using manually controlled technology we introduce robotics to control the pace of production. It helps by saving time for every cycle. It is manually impossible to supervise the controls on a machine at regular intervals but a robot tending saves seconds per cycle for significant increase.

2. Excessive expenditure is calculated for the case of manually controlled machinery that suffers the consequence of retardation and easy degradation. This can happen if the machine is being handled by inexperienced hands. Replacing manual labor with robot tending reduces labor cost.

3. The alternate to specially designed feeding apparatus is a robotic controlled machine with a decreased cost. A robot tending device can function 24×7 without facing any physical drawback. It is flexible since it can easily be adapted to different kinds of machinery.

4. Based on robotic machining consists of facilities that manufacture appliances but the operation is user-friendly since it is robot tended. Instead of a manual faculty, the robotic technology saves space serving two machines at the same time.

Conclusion

Robotic technology that tends to machinery consist of a flexible framework and use of software that is installed in the working vicinity. The programming of robotic precision machining requires firsthand proficiency by engineers (mechanical and computer) which cannot offer visual inspection but is time efficient. Using reliable robotic machining based products has definitely improved the standard quality of manufacture and ensured financial insurance.

[ad_2]

Source by Ford Brown